Retail / Industrial
Food Production facility - Deeside
Pitts Wilson commissioned to install the electrical services to the 75,000 square foot extension to the food production facility including switchgear and distribution, lighting general and specialist power, structured cabling, time and attendance system, intruder alarm, door access, DDA systems, fibre optic cabling, external and security lighting.
Lafarge Plasterboard, Ferrybridge, West Yorkshire
A £35 million construction project covering a 7.4 hectare brownfield site, with a internal floor space of 29,800 square metres. This factory has an annual production capacity of 25 million square metres of plasterboard. Following our successful installation of the HV infrastructure, the client utilized our services again as part of their plant installation.
Wm Morrisons Supermarkets
Among the nationwide projects we help construct for Wm Morrisons we recently designed and built an intelligent lighting system at the petrol station at Morrison's store at Illingworth in West Yorkshire. It is a European first.
Terms & Conditions /
Privacy Policy /
design2b© 2013 Pitts Wilson Electrical Limited
Company No. 03312519




