Our works included lighting and power to the air bridge and alterations to the existing corridor services. Control systems wiring formed part of our contract.
We were then offered an additional contract to carry out the electrical installation to allow for the refurbishment of the baggage handling area. Our works included renewing the lighting and power installations, modifications to the fire alarm system, customer information systems, and security modifications.
Replacement of the Airport’s High Voltage infrastructure to alter the existing system to provide a HV ring system. Our works included the supply and installation of 3 packaged substations and HV cabling and containment. Existing panels were then linked into the new system.
All works were undertaken whilst the areas remained in full use by the Airport.